You are here: Home / CON511 – Basic Construction Schedule Analysis / Case Studies

Case Studies

Case studies for real TxDOT projects have been developed to apply the concepts taught in CON 511. Case Study No. 1 will be used during class to walk through the analysis process and the monthly updating tool. Case Study No. 2 is an example of performing a schedule analysis by hand. A video has been created that shows this process that participants will watch during CON 511. Case Study No. 3 is a supplemental video of performing the analysis process that can be used by CON 511 participants to refresh their understanding of the concepts. Case Study No. 4 and Case Study No. 5 are available for participants to complete during CON 511.

Case Study No. 1

  • US 69 Monthly Updates
  • US 69 Plans
  • US 69 Preconstruction

Case Study No. 2

  • US 82 Monthly Updates
  • US 82 Plans
  • US 82 Preconstruction
  • US 82 Preconstruction Schedule Analysis (1:04:40 hrs)

Case Study No. 3

  • FM 2113 Monthly Updates
  • FM 2113 Plans
  • FM 2113 Preconstruction
  • FM 2113 Preconstruction Schedule Analysis (1:14:41hrs)

Case Study No. 4

  • SH 191 Monthly Updates
  • SH 191 Plans
  • SH 191 Preconstruction

Case Study No. 5

  • FM 117 Monthly Updates
  • FM 117 Plans
  • FM 117 Preconstruction