• Skip to primary navigation
  • Skip to main content
Texas Department of Transportation

TxDOT Project Management Courses

Texas Department of Transportation

  • Home
  • CON 511
    • Resources
    • Modules
    • Case Studies
  • CON 512
  • Contact Us
You are here: Home / CON511 – Basic Construction Schedule Analysis / Modules

Modules

CON 511 consists of three modules and several case studies to apply the concepts. This page includes the information associated with each module.

  • Presentation Slide Deck

Module 1: Introduction and Background

The following videos introduce you to information relevant to construction schedule analysis from the owner’s perspective.  They were developed so you can understand the background information necessary to participate effectively in later portions of the course where we have a virtual interactive environment. Please watch these video before class begins.

  • CON 511 – Basic Construction Schedule Analysis — Introduction (8:24 mins)
  • CON 511 – Basic Construction Schedule Analysis — Module 1: Background Information (Part 1) (17:28 mins)
  • CON 511 – Basic Construction Schedule Analysis — Module 1: Background Information (Part 2) (22:09 mins)

Module 2: Assessment of Construction Schedules

The following videos provide details on the construction schedule analysis process taught in CON 511. You will be asked to watch these videos during scheduled class time.

  • CON 511 – Basic Construction Schedule Analysis — Module 2: Assessment of Construction Schedules (23:25 mins)
  • CON 511 – Basic Construction Schedule Analysis — General Questions Walkthrough (17:24 mins)

Module 3: Monthly Updating

The thought of spending a few hours on each project at the end of each month can be daunting. A tool has been created that helps track project progress each month. Using the output of this tool, you can decide when to engage with the contractor or perform additional detailed schedule analyses on updated schedule submissions. The use of this tool will be taught during CON 511. The video provides an additional resource to review when necessary.

  • CON 511 – Basic Construction Schedule Analysis — Module 3: Monthly Updating Tool Supplemental Video (25:36 mins)

Copyright © 2026 · Texas Department of Transportation · Disclaimer · Accessibility Policy · Website Privacy Policy
Site developed by Texas A&M Transportation Institute